Construction & engineering · Kampala
0.3476° N, 32.5825° E
We build the places Uganda grows into.
Nsimbi is a Kampala-based construction group delivering civil infrastructure, commercial developments and homes across Uganda. We plan carefully, build precisely, and stand behind every structure.
17
Years in practice
148
Projects delivered
98.6%
On-time completion

17
years building through Uganda's dry seasons, wet seasons and everything between.
Construction is a promise. We keep it.
Founded in Kampala in 2009, Nsimbi has grown from a small civil works crew into a full-service construction group. We work where the ground is difficult, the weather is demanding and the stakes are highest — because that is where good construction matters most.
Our teams combine local knowledge with international standards, from the first survey to the final handover. No shortcuts, no surprises, no abandoned sites.
By the numbers
Rolling five-year data
17
Years in practice
Founded in Kampala, 2009
148
Projects delivered
Across six regions
480
People on site & studio
Engineers, builders, planners
98.6%
On-time completion
Rolling five-year average
Built around your brief.
Six disciplines, one accountable team. We can take a project from a rough site sketch to the day you turn the key — or step in at any point along the way.
Work that holds up.
A selection of recent projects across the sectors we know best — built, handed over and still working.
“Nsimbi delivered through two rainy seasons without losing a week. Their programme was honest from the first meeting — and they hit it.”
Daniel Ssemakula
Development Director, Namanve Industrial Estates
No surprises.
By design.
A project is a sequence of decisions. Our process makes the important ones early, in the open, with the people who will live with them.
Listen & survey
We start on the ground, not in the boardroom. Site conditions, access, services, neighbours and the real budget are all established before we draw anything.
1–3 weeks
Plan & price
A buildable design, a transparent cost plan and a programme with named milestones. You see the assumptions, the risks and the number behind every line.
3–8 weeks
Build & report
One project lead, weekly reporting and live cost tracking. Problems are raised early, with options — never saved for a handover meeting.
Programme-led
Hand over & stand by
Commissioning, as-built drawings and a proper handover. Then twelve months of defects liability with a team that still answers the phone.
12-month support
One project lead, start to finish.
Western Uganda / Source protectionBuild for the next generation.
Construction takes a great deal from a place. We think it should give something back. That means sourcing locally, designing for maintenance, cutting waste and training the people who will run this industry after us.
68%
Materials sourced in Uganda
42%
Site waste diverted
120
Apprentices trained since 2019
1.4m
Hours without a lost-time incident
Next step
Have a site in mind? Let's talk.
Send us the outline — location, ambition, rough budget, anything you have. We will tell you honestly what it takes to build it well.




