Skip to content
NsimbiConstruction

The studio / Est. 2009

A Ugandan firm with long horizons.

We are engineers, builders, planners and quantity surveyors — 480 people who believe construction is a long-term promise, not a transaction.

Two team members reviewing drawings on a laptop in a studioKampala studio / Monday review

17

Years in practice

Founded in Kampala, 2009

148

Projects delivered

Across six regions

480

People on site & studio

Engineers, builders, planners

98.6%

On-time completion

Rolling five-year average

Construction workers spreading aggregate on a road project
Black-and-white view of a Ugandan street and its buildings

2009

First site: drainage works in Kawempe, eleven people and one pickup.

01Our story

Started with a drainage contract. Built for the long term.

Nsimbi began in 2009 with a simple observation: too many buildings in Uganda were being delivered as if the only measure of success was the handover date. We thought the measure should be how the building performs ten years later.

The first contract was a drainage scheme in Kawempe. It was unglamorous work in difficult ground, and it taught us the discipline that still defines the firm: understand the site, price honestly, and finish what you start.

Seventeen years later, we work across six regions and every major sector. The scale has changed. The standard has not.

“We are not trying to be the biggest contractor in Uganda. We are trying to be the one you call again.”

Ronald Ssekandi / Founder & Managing Director
02Milestones

Seventeen years, one site at a time.

2009

The first site

Nsimbi is founded in Kamwokya with eleven people and a drainage contract in Kawempe.

2012

First commercial build

A four-storey office in Ntinda marks the move from civil works into buildings.

2016

Certified

ISO 9001 and ISO 45001 certification formalises the quality and safety systems.

2019

Across Uganda

Regional teams open in Mbarara and Gulu. The group completes its 100th project.

2022

Ggaba expansion

A 40-million-litre-per-day water expansion is delivered for the Ggaba Water Authority.

2025

480 strong

The Kampala Innovation Campus completes; the group reaches 480 people across six regions.

03 / What we believe

Four rules we do not bend.

Values are only useful if they change a decision. These four do, regularly.

01

Local knowledge, global standards

We build in Uganda, with Ugandan teams and supply chains — held to the detailing, safety and documentation standards of the best international practice.

02

Say the number

Costs, risks and delays are shared early and in plain language. A difficult truth at week two is worth more than a surprise at handover.

03

Safety is a method

Safety is designed into the programme, not added to the noticeboard. Every person on our sites has the authority to stop work.

04

Build for the next generation

Materials are chosen for maintenance and lifespan, not just first cost. We train apprentices on every project and source locally wherever we can.

04 / People

The people accountable.

Small enough to know your name. Experienced enough to have seen the problem before.

RS

Ronald Ssekandi

Managing Director

A civil engineer with 24 years across roads, water and commercial builds. Founded Nsimbi in 2009 with a pickup, a theodolite and eleven people.

AN

Aisha Nakimuli

Director, Projects

Chartered construction manager and quantity surveyor. Leads delivery across the commercial and residential portfolio, with a reputation for forensic cost control.

PL

Peter Lwanga

Head of Engineering

Structural engineer responsible for design coordination and buildability reviews. Fifteen years in heavy structures, foundations and long-span industrial work.

MA

Miriam Achieng

Head of Safety & Sustainability

Occupational health specialist. Built the site-safety system that has taken Nsimbi through 1.4 million hours without a lost-time incident.

Green hills and a lake in western UgandaWestern Uganda / 2025
05Responsibility

Safety and sustainability are methods.

Both are designed into the programme, not added to the noticeboard. Safety starts with a site-specific plan and the authority for anyone to stop work. Sustainability starts with measuring what we use, and choosing materials for maintenance and lifespan rather than first cost.

We are ISO 45001 certified and aligned with ISO 14001. More importantly, those systems are audited by our own site teams every week — not just by outsiders once a year.

0.12

Total recordable incident rate

1.4m

Hours without a lost-time incident

68%

Materials sourced in Uganda

120

Apprentices trained since 2019

ISO 45001 ISO 14001 aligned ISO 9001

Careers

We are always looking for good people.

careers@nsimbi.ug

Work with us

A studio, a site team and one standard.

Send us the outline — location, ambition, rough budget, anything you have. We will tell you honestly what it takes to build it well.